Order the shortfall, not the shelf.

Every material and outside service on your quotes rolls up by PO number. Quotara checks it against what you have in stock and shows only what is left to buy.

Materials rolled up by PO

Material and outside-service lines from quotes with a PO number land on one list. Group by PO or see one consolidated list, and you get needed, from stock and to order on every line.

  • Group by PO or consolidate
  • Estimated cost of what you still need
  • Export to CSV for your supplier
app.getquotara.com/materials
Materials (BOM) · PO 88412Sample data
MaterialNeededFrom stockTo order
1/2" A36 plate6 sheets42
2" sq. tube, 3/16 wall48 ft480
Powder coat, black1 lotoutside1
Net to order after stock: $1,140

Stock that updates itself

Record what you have and where it lives. When a job is booked, the material it needs comes out of stock automatically, and anything below its reorder point is flagged.

  • Low and out-of-stock flags
  • Reorder points per item
  • Import material parts from your library
app.getquotara.com/inventory
InventorySample data
ItemLocationOn handReorder at
LOW1/2" A36 plateRack A34 sheets6
6061-T6 bar, 2"Rack B136 ft20
OUT3/8-16 hex boltsBin 120 ea100

Know where every order stands

Each line moves from Needs ordering to Ordered to Received with one click, and you can note the supplier. Nobody has to ask whether the plate came in.

  • Needs ordering, Ordered, Received
  • Supplier on each line
  • Tied back to the job and customer
app.getquotara.com/materials
Order statusSample data
MaterialSupplierStatus
1/2" A36 plateMetals DepotOrdered
Powder coat, blackRapid FinishNeeds ordering
2" sq. tubeIn stockReceived

See it on your own job.

14 days free, no credit card. Or book 20 minutes with the founder and bring a drawing: we’ll quote it live.